澳洲幸运5
热门标签

Fukushima debris removal delayed by another year

时间:3周前   阅读:4   评论:1

免费足球推介www.hgbbs.vip)是国内最权威的足球赛事报道、预测平台。免费提供赛事直播,免费足球贴士,免费足球推介,免费专家贴士,免费足球推荐,最专业的足球心水网。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

澳5彩票官网www.a55555.net)是澳洲幸运5彩票官方网站,开放澳洲幸运5彩票会员开户、澳洲幸运5彩票代理开户、澳洲幸运5彩票线上投注、澳洲幸运5实时开奖等服务的平台。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:皇冠平台出租(www.hg8080.vip):一家之煮 马鸿铭

下一篇:三公开船棋牌游戏(www.eth108.vip)

网友评论